Schenker Deutschland

 

New construction of a logistic terminal for Schenker AG. Scope of order of AGO AG: the complete sections Heating/Cooling (incl. heating and cooling ceilings) by means of heat pumps and ventilation systems incl. steam saturator for the transfer stations as well as for the office and floor spaces. The order volume did also include single split refrigeration systems for the computer centre.

 

  • Heat capacity: 200 kW
  • Cooling capacity: 200 kW
  • Air volume: 10.000 m3/h
  • Client: Schenker Deutschland AG

 