Rehau, Feuchtwangen

 

Installation of a heating system, a ventilation system and a compressed air system as well as a degasification plant.

 

  • Ventilation system: 20.000 m3/h
  • Smoke extraction: 2 x 10.000 m3/h
  • Thermal capacity: 300 kW
  • Client: Fa. REHAU AG

 

Hall, cooling plant

 

Back

Hall, cooling plant

Hall, cooling plant

Hall, cooling plant

Hall, cooling plant

Hall, cooling plant