Kennametal, Mistelgau
The scope of supply included an air conditioning system with fresh air supply and heat recovery system for the new production facility in Mistelgau.
- Air Volume: 60.000 m³/h
- Heat recovery capacity: 556 kW
- Heating capacity: 344 kW
- Refrigeration capacity: 524 kW
- Client: Kennametal Produktions GmbH & Co. KG
- Installation time: March to July 2017
Back