Hotel Verde Capetown, South Africa

 

For Africa’s greenest hotel located nearby South Africa’s Cape Town International Airport the AGO AG has successfully commissioned the energy plant. Our engineers got to work in order to develop and build a highly efficient heat pump system for heating domestic water and air conditioning. The heat pumps are connected to a huge geothermal system holding 11 km of piping and 100 boreholes.

 

The hot water for the hotel is stored in tanks with a capacity of 12.000 l / at 60°C, which are also heated by the heat pumps.

 

  • Cooling capacity: 305 kW
  • Heating capacity: 350 kW
  • Design: AGO AG Energie + Anlagen
  • Client: Dematech Pty Ltd

 

view outside hotel Verde in Capetown, energy station

 

Related Files

 

Related Links

 

 

Back

Hotel Verde Capetown, South Africa

 

For Africa’s greenest hotel located nearby South Africa’s Cape Town International Airport the AGO AG has successfully commissioned the energy plant. Our engineers got to work in order to develop and build a highly efficient heat pump system for heating domestic water and air conditioning. The heat pumps are connected to a huge geothermal system holding 11 km of piping and 100 boreholes.

 

The hot water for the hotel is stored in tanks with a capacity of 12.000 l / at 60°C, which are also heated by the heat pumps.

 

  • Cooling capacity: 305 kW
  • Heating capacity: 350 kW
  • Design: AGO AG Energie + Anlagen
  • Client: Dematech Pty Ltd

 

view outside hotel Verde in Capetown, energy station

 

Related Files

 

Related Links

 

 

Back

view outside hotel Verde in Capetown, energy station

view outside hotel Verde in Capetown, energy station

view outside hotel Verde in Capetown, energy station

view outside hotel Verde in Capetown, energy station

view outside hotel Verde in Capetown, energy station

view outside hotel Verde in Capetown, energy station