Installation of two turbo chillers with integrating heat exchanger for free cooling.
The respective cooling water system with new open coolers has been installed on the roof of the building.
Extended cooling capacity: 2 x 1,5 MW
Recooling capacity: 2 x 1,8 MW
Cooling capacity free cooling: 1 x 1,5 MW
3
Client: HBM Hessisches Baumanagement
Back