FairNetz GmbH, Reutlingen

 

The scope of supply included dismantling of existing boilers and installation of a new hot water boiler plant including 3 bivalent firing system to supply the district heating network of the city of Reutlingen.

 

  • Heating capacity: 10.000 kW
  • Operating pressure: 16 bar
  • Operating temperature: 130°C
  • Client: FairNetz GmbH
  • Installation time: February 2016 to October 2016

 