Molkerei Gropper GmbH & Co. KG (dairy company)

 

Installation of a CHP, exhaust gas steam generator and heat exchanger, absorption chiller with NH3 -8°C, lube oil system, noise reducing enclosure, exhaust silencer and switchgear with superordinate control. Assembly on site, commissioning and trial operation.

 

 

1st construction stage

  • Thermal capacity 2,48 MW
  • Electrical capacity: 2,15 MW
  • Steam output: 1,5 to/h / 12,0 bar
  • Client: Molkerei Gropper GmbH & Co. KG (dairy company)
  • cooling via ago congelo® NH3 / H2O-absorber 500 KW

 

2nd construction stage

  • Thermal capacity: 2,28 MW
  • Electrical capacity: 2,14 MW
  • Steam capacity: 1,5 to/h
  • Client: Molkerei Gropper GmbH & Co. KG (dairy company)
  • cooling via ago congelo® NH3 / H2O-absorber 500 KW

 

 

Outdoor areaOutdoor area, CHPago congeloDesign of a plantchillers, fresh, oil, old oil  

 

 

Related Files

 

 

Back

Outdoor areaOutdoor area, CHPago congeloDesign of a plantchillers, fresh, oil, old oil

Outdoor areaOutdoor area, CHPago congeloDesign of a plantchillers, fresh, oil, old oil

Outdoor areaOutdoor area, CHPago congeloDesign of a plantchillers, fresh, oil, old oil

Outdoor areaOutdoor area, CHPago congeloDesign of a plantchillers, fresh, oil, old oil

Outdoor areaOutdoor area, CHPago congeloDesign of a plantchillers, fresh, oil, old oil

Outdoor areaOutdoor area, CHPago congeloDesign of a plantchillers, fresh, oil, old oil