The new combined heat and power plant supplies the city consisting of 100,000 residents with power and hot water. A Greek company designed the building and the boiler plant, currently with 75 MW (final stage approximately 115 MW). AGO installed the complete gas engine plant with Deutz engines, including the entire electrical engineering, medium voltage system, and SCADA system.
Back
The new combined heat and power plant supplies the city consisting of 100,000 residents with power and hot water. A Greek company designed the building and the boiler plant, currently with 75 MW (final stage approximately 115 MW). AGO installed the complete gas engine plant with Deutz engines, including the entire electrical engineering, medium voltage system, and SCADA system.