Energy supply for a new production hall with compressed air, water, steam, condensate and implementation of a cogeneration plant with steam generation. The engine waste heat is used for domestic heating water and heating as well as heating of the building. A 80 m³-buffer was installed to compensate load fluctuations.
Back