Beck + Heun, Mengerskirchen

 

Realization of a new boiler plant at Mengerskirchen where AGO AG installed two boilers and the downstream flue gas heat exchangers.

 

  • Steam output: 2 x 4,0 t/h Dampfleistung, 10,0 barÜ
  • Design: AGO AG Energie + Anlagen
  • Client: Beck + Heun GmbH

 

 

two steam boiler with Exhaust Heat Exchanger

 

Back

Beck + Heun, Mengerskirchen

 

Realization of a new boiler plant at Mengerskirchen where AGO AG installed two boilers and the downstream flue gas heat exchangers.

 

  • Steam output: 2 x 4,0 t/h Dampfleistung, 10,0 barÜ
  • Design: AGO AG Energie + Anlagen
  • Client: Beck + Heun GmbH

 

 

two steam boiler with Exhaust Heat Exchanger

 