The scope of supply included installation and commissioning of 2 steam boilers each generating 7,5 to/h steam at 10,0 bar. The system included an exhaust heat exchanger for return flow pre-heating of the district heating network, instrumentation and control technology and steel platform. The new boiler plant was embedded hydraulically into the existing system.